What types of construction drawings are there?
Which drawings does your project need? VORM4 explains architectural and structural drawings, SO to UO design stages, BIM and as-built documentation.

A floor plan explains a building's layout. A structural drawing shows how the building is supported. A working drawing gives the contractor the dimensions and connections needed on site. Each drawing has its own purpose.
For property owners, developers, architects and contractors, the key question is which drawings are needed for the next step. Below, we explain the types of construction drawings, design stages and the role of BIM and 3D scanning.
Architectural and structural drawings: what is the difference?
Architectural drawings
Architectural drawings describe a building's layout, form and construction. They cover spaces, façades, windows and doors, floors, roofs and their interfaces. They show what the design looks like and how building elements come together.
Structural drawings
Structural drawings describe the load-bearing structure: foundations, load-bearing walls, columns, beams, floors and stability systems. They translate structural calculations into dimensions, materials and connections.
These disciplines need to be coordinated. A stair opening, façade detail or service penetration often affects both. In our architectural and structural drawing services, we coordinate the design, calculations and drawings.
From SO to UO: drawings at each design stage
A design is developed step by step. The stage determines how much information a drawing contains. An early design sketch serves a different purpose from a drawing used for construction.
SO: concept or schematic design
This early stage explores the overall form, layout and possibilities. The Dutch abbreviation SO can mean either sketch design or, in a formal project structure, schematic design. Agree what this stage means for your project.
VO: preliminary design
The VO develops the chosen approach into floor plans, elevations and sections. Overall dimensions, use and initial structural decisions are coordinated, helping compare options and make decisions.
DO: developed design
The DO establishes the chosen layout, main dimensions and materials in greater detail. Architectural and structural elements are coordinated. The design becomes more clearly defined, while construction details may still need further development.
TO: technical design
The TO describes construction build-ups, materials and key interfaces. Together with calculations and specifications, it supports pricing and contract formation. Tender drawings often belong at this level; they do not automatically form a complete construction set.
UO: construction-ready design
The UO develops the plan for construction. Dimensions, details and interfaces must be clear enough to carry out the agreed work. Coordination with building services and suppliers is also included. Responsibility for each element must be agreed in advance.
General arrangement drawings may use scales such as 1:100 or 1:50, with details at 1:10 or 1:5. Scale alone does not determine whether a drawing is ready for construction. Its content and the agreed scope are decisive.
Record the division of responsibilities in the commission, for example using the standard task description published by BNA and NLingenieurs.
What types of construction drawings are there?
Site and external works drawings
A site plan shows the building's position on the plot and its relationship with its surroundings. External works drawings may also show paving, access, parking, site levels and connections.
Floor plans and roof plans
A floor plan is a horizontal section through a storey, showing walls, rooms, doors, stairs and dimensions. A roof plan shows roof geometry, openings, falls and drainage.
Façade drawings and elevations
Façade drawings show a building's exterior, including window and door openings, heights and materials. Elevations can also show individual elements, such as a steel frame or internal wall.
Section drawings
A section cuts vertically through the building, revealing storey heights, floor and roof build-ups and their relationship with the foundations. In existing buildings, this helps explain the construction.
Detail drawings
A detail drawing enlarges an interface, such as a façade-to-roof or floor-to-window connection. Architectural details describe matters such as insulation and waterproofing. Structural details show bearings, anchors and connections.
Foundation and piling plans
These drawings show the positions and dimensions of foundation elements. For piled foundations, the piling plan includes pile positions and numbering. The details align with the structural calculations and foundation recommendations.
Floor, wall and roof structural layouts
Structural layouts show the positions and relationships of load-bearing elements, such as joists, concrete floors, stability walls, steel sections and timber trusses. They may also include bearings and references to details.
Formwork and reinforcement drawings
A formwork drawing establishes the shape and dimensions of a concrete element. A reinforcement drawing shows the required reinforcement, including positions, diameters and spacing. The information must match the calculations and agreed construction method.
Opening and penetration drawings
These drawings define openings for stairs, shafts and building services. Their positions and dimensions are coordinated with the load-bearing structure. Drawing an opening does not in itself establish that it is structurally feasible.
Existing condition, demolition and alteration drawings
These distinguish existing elements, items to be removed and new work, making the proposed changes clear. Reliable information about the existing building is particularly important for renovation and conversion projects.
Permit application drawings
These support the assessment of a permit application. They may show existing and proposed conditions, dimensions and use. The required drawings and supporting documents are determined for each project. An application set is generally not a complete construction set.
Tender and working drawings
Tender drawings describe the work for pricing and contract formation, alongside the specification. Working drawings add the dimensions and details needed for construction. Their purpose and level of development are the main differences.
Fabrication and assembly drawings
Fabrication drawings explain how components are made, such as steel connections, precast concrete or timber frame elements. Assembly drawings show where and how they are installed. This work often lies with a supplier or specialist, subject to agreed checks and coordination.
Revision and as-built drawings
Revision drawings incorporate changes to earlier versions. As-built drawings record the completed condition using verified information. They support building management, maintenance and future alterations. Agree how deviations will be recorded and checked.
Building services and fire safety drawings
Building services drawings show pipe routes, ventilation ducts and plant rooms, for example. Fire safety drawings identify compartments and escape routes. These are separate disciplines that need coordination with architectural and structural drawings.
How do 2D drafting, 3D modelling and BIM fit in?
2D and 3D describe how information is represented. Plans, elevations and sections are 2D drawings. A 3D model shows spatial relationships. BIM also links building elements to information and coordinates models across disciplines.
Different drawings can be derived from a properly structured BIM model. This requires a suitable model and the agreed information. BIM does not replace technical checks of drawings and calculations. Read how a good BIM model helps prevent construction errors.
Drawings for existing buildings start with reliable information
Archive drawings are a useful starting point but may differ from reality. A building survey and 3D scanning of existing buildings help record visible geometry and dimensions. This information can then be incorporated into drawings and a BIM model, a process also known as scan-to-BIM.
A 3D scan does not reveal hidden reinforcement or fully concealed structures. Further investigation may be needed for that information. This makes clear which elements have been measured and where assumptions remain.
Which drawings does your project need?
- Assessing a new-build proposal: start with design drawings and initial structural coordination.
- Redeveloping an existing property: record the existing condition and coordinate demolition, the new layout and structural changes.
- Comparing prices: establish a common basis with technical drawings and clear specifications.
- Preparing for construction: develop outstanding dimensions, details, openings and supplier information.
- Managing a building: record agreed revisions and the verified as-built condition.
Also agree who prepares drawings, performs calculations, checks the work and supplies each file. Deliverables may include PDF drawings, DWG files and a Revit or IFC model. State the status, revision and date so everyone uses the correct version.
Early coordination helps avoid redrawing later. Our article on involving a structural engineer early explains how design and structure influence each other.
Drawing services from VORM4
Based in Leeuwarden, VORM4 Engineers works for property owners, developers, architects and contractors. We provide architectural and structural drawings for new builds, renovations and conversions in Friesland, Groningen and beyond.
We can develop a supplied design or join an ongoing project. Together, we agree the required stage, drawings and models. Explore our drawing and 3D modelling services or advice and project support.
Would you like to know which drawing set will move your project forward? Discuss your project with VORM4 so we can agree the appropriate level of development.
Questions about this article.
Have a question about applying this to your project?
Contact usWhat is the difference between architectural and structural drawings?
Architectural drawings describe a building's layout, form and construction. Structural drawings describe its load-bearing structure, including foundations, beams, columns and connections. Both must align with the design and structural calculations.
What do SO, VO, DO, TO and UO mean?
These Dutch abbreviations describe design stages: SO is concept or schematic design, VO preliminary design, DO developed design, TO technical design and UO construction-ready design. The scope and division of responsibilities are agreed for each commission.
Are permit drawings sufficient for construction?
Permit drawings support an application and are generally not a complete construction set. Construction often requires additional dimensions, details, structural information and supplier drawings. What is missing depends on the project.
What is the difference between a BIM model and a construction drawing?
A drawing shows a particular elevation, plan, section or detail. A BIM model contains spatial geometry and information about building elements. Drawings can be derived from it, but still need technical checking.
When is 3D scanning useful for drawing work?
3D scanning is particularly useful when an existing building lacks current drawings or reliable measurements. It records visible geometry and dimensions. Hidden structures and reinforcement may require further investigation.
What is the difference between revision and as-built drawings?
Revision drawings incorporate changes to earlier drawings. As-built drawings record the completed condition using verified information. An updated design drawing is not automatically a verified as-built drawing.