Project

Royal A-Ware: Expansion of business space

For Royal A-Ware in Lopik, VORM4 provided the structural design of the new headquarters and the expansion of production capacity. Despite a late entry into the process, we were able to quickly understand and solve the technical bottlenecks. Thanks to our insight and flexibility, the client was able to build on a safe, thoughtful and executable design.

Type

Designs and calculations

Opdrachtgever

Omgeving

Tijdsduur

2021 — 2023

Rol VORM4

Chief Constructor

Architect

The 4th side

Ontwikkelaar

Installatieadviseur

Aannemer

Dijkham Construction

Projectmanagement

Bouwmanagement

Bouwfysica

Installatietechnisch adviseur

0
Days of delay
100%
Constructive safe
Uitdaging

VORM4 was only involved after construction had already started. There were still many open points in the design that needed to be resolved soon. In addition, no construction system had yet been chosen for a number of building components, making it difficult to provide good insight into the costs. The customer was looking for a partner that could switch quickly and provide insight into the impact of choices on implementation and costs.

Oplossing

With the help of advanced 3D software, VORM4 quickly identified all the bottlenecks and presented several solution directions. By making them visually transparent, Royal A-Ware was able to make effective choices. Structural safety was also reassessed, including detailed engineering of steel, concrete and pile foundations, leading to a well-founded and safe final design.

Laten we slim & samen ontwikkelen

Klaar om bewust voor innovatie, efficiëntie en duurzaamheid te kiezen? Heb je ideeën die staan te trappelen om werkelijkheid te worden? Stuur ons een bericht!

No items found.
Bouwen zonder verrassingen

Constructive process without delay

Despite a late entry, VORM4 with all deadlines by immediately identifying bottlenecks and calculating them down to the detail level.

Design review

The initial design was checked for structural feasibility and technical risks.

Establish starting points

Bottlenecks and possible solutions were identified and discussed with the parties involved.

Establish starting points

The principles have been documented and shared with all stakeholders for approval.

Static calculations

Calculations have been drawn up for each component, including foundations and main supporting structures.

Engineering coordination

All calculations and designs have been coordinated with other engineers involved.

Detail engineering control

Detailed calculations and drawings have been checked, from steel and concrete structures to pile foundations.

Andere projecten

Ready to give your project a boost? Do you have ideas that are eager to become a reality? Send us a message! We're here to listen, brainstorm and create something great together

Find out how we can help you

Donec a pulvinar ipsum. Proin interdum constructeur author. In sex crisis crisis. Pellentesque accuman, nil et varius imperdiet, mauris nil tristique diam, ac sollicititudin massa metus sed leo. Integer lorem urna, convallis et eros id, consistent molestation eros. German portal is very engaging, faucibus orci quis.