Royal A-Ware: Expansion of business space
For Royal A-Ware in Lopik, VORM4 provided the structural design of the new headquarters and the expansion of production capacity. Despite a late entry into the process, we were able to quickly understand and solve the technical bottlenecks. Thanks to our insight and flexibility, the client was able to build on a safe, thoughtful and executable design.
Designs and calculations
2021 — 2023
Chief Constructor
The 4th side
Dijkham Construction
VORM4 was only involved after construction had already started. There were still many open points in the design that needed to be resolved soon. In addition, no construction system had yet been chosen for a number of building components, making it difficult to provide good insight into the costs. The customer was looking for a partner that could switch quickly and provide insight into the impact of choices on implementation and costs.
With the help of advanced 3D software, VORM4 quickly identified all the bottlenecks and presented several solution directions. By making them visually transparent, Royal A-Ware was able to make effective choices. Structural safety was also reassessed, including detailed engineering of steel, concrete and pile foundations, leading to a well-founded and safe final design.

Klaar om bewust voor innovatie, efficiëntie en duurzaamheid te kiezen? Heb je ideeën die staan te trappelen om werkelijkheid te worden? Stuur ons een bericht!
Constructive process without delay
Despite a late entry, VORM4 with all deadlines by immediately identifying bottlenecks and calculating them down to the detail level.
Design review
The initial design was checked for structural feasibility and technical risks.
Establish starting points
Bottlenecks and possible solutions were identified and discussed with the parties involved.
Establish starting points
The principles have been documented and shared with all stakeholders for approval.
Static calculations
Calculations have been drawn up for each component, including foundations and main supporting structures.
Engineering coordination
All calculations and designs have been coordinated with other engineers involved.
Detail engineering control
Detailed calculations and drawings have been checked, from steel and concrete structures to pile foundations.
Projecten die innovatie en efficiëntie aantonen
Elk project laat zien hoe we complexe uitdagingen vertalen naar efficiënte, toekomstbestendige oplossingen met de nieuwste technologieën.

New construction and revitalization of the Enexis office in Kolham, with a focus on earthquake resistance and minimal impact on existing buildings.